Jump to content
*** New Software Coming Soon! Please Check for Important Information in the Read Me Section ***

Recommended Posts

Posted

Yesterday we saw clear traces of the work, the entire floor of the LR was covered with dust before going UM (cam 1.6) and everything was cleaned under UM.
They have probably also fixed the bad floorboards downstairs (in to the shower). As well as we saw they had started on the floor of the master bedroom cam 2.1.

  • Like 1
Posted
41 minutes ago, Noldus said:

Yesterday we saw clear traces of the work, the entire floor of the LR was covered with dust before going UM (cam 1.6) and everything was cleaned under UM.
They have probably also fixed the bad floorboards downstairs (in to the shower). As well as we saw they had started on the floor of the master bedroom cam 2.1.

that's great news Noldy...thank you!

Posted
Just now, firewall said:

would be good also to add a new camera for the master bedroom for the bed

they ought to put cameras in all the hiding places while they are at it and fix the backyard camera.  

Posted

I assume they will go on with the top floor soon then. But that will effect much less of the house.

Posted
16 minutes ago, Noldus said:

new floor in the shower

new cam 3,2 (Alles old room) and 3.7 in Cherry's old room

👏🥳

Guest
This topic is now closed to further replies.
×
×
  • Create New...